This project consisted of replacing approximately 700 ft of deteriorated step stone revetment with steel sheet pile and tiered steps for erosion protection and reduction of flooding due to wave over-topping. Backshore grading and drainage were included to help direct wave over-topping through the drainage gap and harbor and reduce the amount of standing water behind the revetment. Additionally, a pathway was constructed to reach the universal access contained in the revetment immediately to the north.
STATUS
Complete
OWNER
US Army Corps of Engineers
ARCHITECT
US Army Corps of Engineers