This project consisted of the removal of the existing two-span bridge structure with sixteen-21" deep PPC deck beams in each span, two closed abutments and a solid wall pier on spread footings. A new four-span bridge was constructed to carry Warrenville Road over the West Branch of the DuPage river, just west of Winfield Road in the City of Warrenville.
STATUS
Complete
OWNER
Illinois Department of Transportation
ARCHITECT
Bowman, Barrett & Associates