The scope of work included the construction of a museum campus along the Rock River that incorporated steel sheeting, excavation and grading, paved walkways, retaining walls, masonry, decorative metal handrails, landscaping, lighting, an amphitheater, and a 237.5ft two span steel truss cable stayed pedestrian bridge, with a center cable tower that is 82'-6" tall.
Project Status
Completed 2012
Owner
City of Rockford, IL
Architect
McClure Engineering Associates