The removal of the existing pedestrian bridge, asphalt bicycle path and sidewalk. The construction of a 145-by-11.8-feet-wide single-span new ornamental steel tube arch pedestrian bridge. Other work included steel pile-driven foundations, structural excavation, structural concrete, asphalt, concrete sidewalks and curbs, lighting, landscaping, and pavement markings.
Project Status
Completed Winter 2005
Owner
CDOT
Architect
Ciorba Group, Inc.