PROJECT STATUS

COMPLETED FALL 2019

OWNER

INDOT

ARCHITECT

BEAM, LONGEST, & NEFF, LLC

"For those of you who didn't attend, I just want to say how pleased the City Engineering Department is with the quality of workmanship on the project. While there was some humor surrounding the curbs on the bridge, I will repeat how impressed I am about the attention to detail the cement finishers spent on making those approach curbs look so well. Well done to ICC Group."

Dean Button - City Engineer, Hammond

The scope of this project included the construction of a 600 LF long x 13'4" LF wide pre-engineered prefabricated steel pedestrian bridge with cast in place concrete deck.  The bridge was constructed  over a major intersection (Calument Ave. & Conkey St.) in Hammond, IN.  The bridge included 4 cast in place piers, 5 spans (4 qty 100 LF spans, and 1 qty 200 LF span), MSE walls with compacted granular fill at the abutments, and architectural lighting.