PROJECT STATUS

COMPLETED FALL 2019

OWNER

KANE COUNTY FOREST PRESERVE DISTRICT

ARCHITECT

GEWALT HAMILTON ASSOCIATES, INC.

The scope of this project included the construction of a single span 200 LF long x 10' LF wide pre-engineered prefabricated steel pedestrian bridge with timber deck.  Both cast-in-place abutments were supported on auger cast piles.